Home / News

News · 2 November 2026

New this week: gas turbines and gensets, 50 and 60 Hz

Available now. Seller data, subject to prior sale.

Gas turbines, 60 Hz

  • 1 x Kawasaki L30A, 34 MW, built 2020, about 20,000 h, dual fuel, DLE, generator set without heat recovery steam generator
  • 6 x GE Frame 6B, refurbished turbines with new 60 Hz generators, about 39 MW ISO each, 60 Hz conversion status to be confirmed
  • 4 x GE Frame 7BE, zero-hour rebuild, about 67 MW ISO each, offered as a package with 4 x GE 7EA

Gas turbines, 50 Hz

  • 3 x GE LM6000 PF Sprint, built 2017, output to be confirmed
  • Up to 5 x Siemens SGT-300-1S, about 8 MW each, built 2021, with heat recovery steam generators and transformers

Gas gensets

  • Hyundai H35GV, new, 5.6 to 9.7 MW, 50 or 60 Hz

Prices and data sheets after receipt of your LOI with model and quantity.

Contact: Lothar Schreiner, LKS 360-SCHREINER LLC | manager@lks360.com | WhatsApp +49 170 4656619

Availability changes every week. All units are offered on behalf of their owners and subject to prior sale. Current units: inventory.

All news