How heat recovery repowering turns a coal unit into a combined cycle plant, when it pays and which gas turbines fit.
What is coal-to-gas heat recovery repowering? Heat recovery repowering replaces the coal boiler of an existing power plant with one or more gas turbines and a heat recovery steam generator (HRSG); the gas turbine exhaust raises steam for the plant's existing steam turbine, so the coal unit becomes a combined cycle plant. It suits plants whose steam turbine, condenser, cooling system and grid connection still have decades of life left. LKS 360-SCHREINER LLC lists gas turbines and gas turbine trains with HRSG for such projects on behalf of their owners.
In heat recovery repowering the coal boiler of an existing power plant is taken out of service and replaced by one or more gas turbines with a heat recovery steam generator (HRSG). The gas turbines produce power directly, and their hot exhaust raises steam in the HRSG for the plant's existing steam turbine. The coal unit becomes a combined cycle plant that keeps its steam turbine, condenser, cooling system, switchyard and grid connection.
Reference: according to Siemens Energy, Cooperative Energy replaced an existing coal-fired unit at the R.D. Morrow, Sr. Generating Station in Mississippi (coal station built in 1978) with an SGT6-9000HL gas turbine that works together with the plant's existing steam turbine. The plant delivers 550 MW, and Siemens Energy states a carbon footprint reduced by 50 percent compared with the coal unit.
The steam an HRSG can raise follows from the exhaust flow and exhaust temperature of the gas turbine. It has to fit the design steam flow, live steam pressure and temperature, and any reheat of the existing steam turbine. If the gas turbine is too small, the steam turbine runs at part load; if it is too large, steam has to be bypassed or the gas turbine runs below its rating. The usual tools are:
The basis for sizing is the heat balance of the steam turbine and the exhaust data of the gas turbine at site conditions, checked by the buyer's engineer.
The gas turbine generator has to match the grid. A plant on a 60 Hz grid, as in North America, needs a 60 Hz gas turbine generator set or one rated for both frequencies. A plant on a 50 Hz grid, as in Europe and large parts of Asia, needs a 50 Hz unit. A geared gas turbine can sometimes be adapted with a different gearbox; a large direct drive gas turbine runs at grid speed and stays on its frequency. See also used 60 Hz units for the Americas.
| Stock number | Unit | Output | Frequency | Note |
|---|---|---|---|---|
| LKS-GT-02 | Siemens SGT-800 gas turbines | 51.9 MW | 50/60 Hz | New, 2024 |
| LKS-GT-25 | Siemens SGT-700 gas turbine train with dual-pressure HRSG | 31.64 MW | 50 Hz | 2023; gas turbine train and HRSG, steam turbine not included |
| LKS-GT-30 | GE Frame 9E PG9171E gas turbine | 126 MW | 50 Hz | 2009 |
| LKS-GT-36 | 2 x GE Frame 9E (9171) dual fuel gas turbines | 243 MW (two units combined) | 50 Hz | Used, 2000, available for relocation |
Data as listed by the owners. Each unit is offered on behalf of its owner and subject to prior sale, price on request. Exhaust data, documents and inspection follow a letter of intent. Model guides: Siemens SGT-800, Siemens SGT-700, GE Frame 9E.
Yes. In heat recovery repowering the coal boiler is replaced by one or more gas turbines and a heat recovery steam generator, which raises steam for the existing steam turbine. The steam turbine, condenser and cooling system have to be in good condition, and the HRSG steam data have to match the steam turbine.
According to Burns & McDonnell (2020), keeping the existing steam turbine essentially eliminates a third of the cost of a brand-new build, provided the equipment is in good working condition. The actual saving depends on the condition of the steam turbine, the condenser, the cooling system and the grid connection.
Yes. According to Siemens Energy, Cooperative Energy replaced an existing coal-fired unit at the R.D. Morrow, Sr. Generating Station in Mississippi, built in 1978, with an SGT6-9000HL gas turbine working together with the plant's existing steam turbine; the plant delivers 550 MW.
Matching the gas turbine to the steam turbine. The steam an HRSG can raise follows from the exhaust flow and temperature of the gas turbine, and it has to fit the design steam flow, pressure and temperature of the existing steam turbine. The usual tools are the choice of gas turbine size and number, supplementary firing in the HRSG and the HRSG pressure levels.
Yes. A plant on a 60 Hz grid, as in North America, needs a 60 Hz gas turbine generator set or one rated for both frequencies. A plant on a 50 Hz grid, as in Europe and large parts of Asia, needs a 50 Hz unit.
For 50 Hz and 60 Hz: LKS-GT-02 Siemens SGT-800 (new, 50/60 Hz). For 50 Hz: LKS-GT-25 Siemens SGT-700 gas turbine train with dual-pressure HRSG, steam turbine not included; LKS-GT-30 GE Frame 9E; LKS-GT-36 two GE Frame 9E units. Each unit is offered on behalf of its owner, price on request.
More: gas turbines for sale, steam turbines, condensing vs back pressure steam turbine, gas turbine FAQ, buyer guide.
Send the steam turbine data, grid frequency and site continent. We reply with matching gas turbines.