Stock No. LKS-GT-02 · Gas turbine
Siemens SGT-800 gas turbines
51.9 MW50/60 Hz2024New
Last confirmed 12 November 2026
Knowledge
Bridge and prime power with aeroderivative and industrial gas turbines: what fits, how fast it starts and what a buyer should check.
Can used gas turbines power a data center? Yes. Aeroderivative gas turbines such as the GE LM2500, LM6000 and TM2500 start within minutes and serve as bridge power until the grid connection is ready or as prime power where the grid is weak, according to GE Vernova. Industrial gas turbines such as the Siemens SGT-800 and GE Frame 6B suit larger continuous loads. LKS 360-SCHREINER LLC lists such units on behalf of their owners.
Bridge power is on-site generation that runs a data center until the grid connection is ready. According to the GE Vernova data center FAQ (5 August 2025), mobile gas turbine units such as the TM2500 can provide bridge power during testing, commissioning or utility delays.
Prime power means the turbines are the main source. The same GE Vernova FAQ states that in areas with unreliable grid infrastructure aeroderivative gas turbines can serve as the primary power source, and that turbines can act as primary power, backup generation or part of a hybrid system.
Example: according to GE Vernova, it is delivering 29 LM2500XPRESS aeroderivative packages that can provide nearly 1 GW for Crusoe's data centers.
For larger, continuous loads buyers look at industrial gas turbines. According to POWER (1 September 2026), medium-sized gas turbines are often selected for distributed power generation and data center applications.
A heat recovery steam generator can be added later for combined cycle, which raises efficiency for prime power.
According to POWER (1 September 2026), GE Vernova is mostly sold out through 2030; heavy duty machines are scheduled for shipment in 2030 or 2031 and expected in service in 2032 or 2033, and a heavy duty turbine may need another 18 months of site work after shipment, while an aeroderivative could be commissioned in about six months. Siemens Energy reported 69 GW of firm gas turbine backlog plus 26 GW under slot reservations in the same article.
A used unit already exists. Its delivery time depends on its condition, any overhaul, dismantling and transport, and is checked for each unit; LKS 360-SCHREINER LLC does not quote a general figure.
The generator has to match the grid of the site: 60 Hz in North America, 50 Hz in Europe and large parts of Asia. GE Vernova offers the LM2500 with 50 Hz and 60 Hz options. A unit built for one frequency usually needs a different generator or gearbox for the other. See used 60 Hz units for the Americas.
Data centers are often built near towns, so NOx limits matter. GE Vernova states that the LM2500XPRESS has dual fuel dry low emissions capability that meets 15 ppm NOx on gas fuel, and that the Crusoe units also use selective catalytic reduction. The LM6000 is offered with DLE or with a water injected single annular combustor (SAC). For a used unit the combustion system on the data sheet decides whether it meets the permit at the site.
Trailer mounted units such as the TM2500 can move to the next site when the grid connection is ready. GE Vernova states an installation time of about 14 days for the TM2500. For a used mobile unit the number and condition of the trailers and the mobile balance of plant matter as much as the engine.
Please confirm that the unit will not be delivered to a sanctioned country.

Stock No. LKS-GT-02 · Gas turbine
51.9 MW50/60 Hz2024New
Last confirmed 12 November 2026

Stock No. LKS-GT-03 · Gas turbine Reserved
53 MW GT + 25 MW ST50 Hz2017Asia
Last confirmed 13 October 2026

Stock No. LKS-GT-12 · Gas turbine
38.6 MW50 HzOEM overhauled
Last confirmed 15 October 2026

Stock No. LKS-GT-13 · Gas turbine
39.2 MW
Last confirmed 30 September 2026

Stock No. LKS-GT-17 · Gas turbine
33.6 MW50/60 Hz
Last confirmed 30 September 2026

Stock No. LKS-GT-19 · Gas turbine
60 HzAmericas
Last confirmed 30 September 2026

Stock No. LKS-GT-20 · Gas turbine
60 HzAmericas
Last confirmed 16 August 2026

Stock No. LKS-GT-32 · Gas turbine
42.3 MW1994Usedapprox. 17,000 h
Last confirmed 11 November 2026

Stock No. LKS-GT-35 · Gas turbine
approx. 46 MW50 HzUsedAsia
Last confirmed 14 November 2026

Stock No. LKS-GT-38 · Gas turbine
26.2 / 29 MW (reported)50/60 Hz2013Used
Last confirmed 11 November 2026
Each unit is offered on behalf of its owner and subject to prior sale, price on request.
Yes. GE Vernova states that aeroderivative gas turbines can serve as the primary power source in areas with unreliable grid infrastructure, and that turbines can act as primary power, backup generation or part of a hybrid system.
Bridge power is temporary on-site generation that runs the data center until the grid connection is ready. GE Vernova names mobile gas turbine units such as the TM2500 for bridge power during testing, commissioning or utility delays.
They start fast and are compact. GE Vernova states a ramp up in five minutes for aeroderivatives; for the LM6000 it states 5 minutes to full power, and for the LM2500 a start from cold iron to base load within 5 minutes.
According to POWER (1 September 2026), GE Vernova is mostly sold out through 2030; heavy duty machines ordered now are scheduled for shipment in 2030 or 2031, while an aeroderivative could be commissioned in about six months. A used unit already exists; its delivery time depends on its condition, overhaul needs and transport and is checked per unit.
The generator has to match the grid of the site: 60 Hz in North America, 50 Hz in Europe and large parts of Asia. Many aeroderivative packages are offered for both frequencies; the data sheet of each used unit states its frequency.
Aeroderivatives such as the GE LM2500, LM6000 and TM2500, and industrial gas turbines such as the Siemens SGT-800 and GE Frame 6B, each with a stock number and its own page, offered on behalf of their owners, price on request.
More: gas turbines for sale, LM2500 vs TM2500, LM6000 vs LM2500, gas turbine FAQ, buyer guide.
Send the load, frequency, fuel and timeline. We reply with matching units.
Contact